  1. FLOOR CLEANING
    Before installing the PU material onto the floor, it is necessary to clean the floor thoroughly. Clean off the dust, and remove the grit using portable grinder or shaver.
  2. MAINTENANCE
    For new R. C. floor, do not install the PU material until the cement is completely dried and stable after 3-4 weeks of maintenance period.
  3. When ground humidity is tested on a sunny day, use a transparent plastic film to cover the ground and adhere it on 4 sides. After 2 to 4 hours check if there is any drain generated. Do not install the PU material if drain is generated. Installation is allowed only when ground humidity below 8%.
  4. PRIME CONSTRUCTION
    Thoroughly clean the ground and make sure the ground humidity is satisfactory for constructing. Coating the bottom material onto the construction surface uniformly with a roller. Then coating middle layer after one hour.
  5. MATERIAL MIXING AND AGITATION
    1. The agitating location should be guarded with a sheet or pad to keep the location clean.
    2.    
    3. Clean the container cover upon opening it.
    4.    
    5. Fill the hardener (clear liquid) at first, and then fill the primer (colorful liquid) into the mixing tank. It should be filled directly from the corner of the tank. DON’T fill it from the edge of the tank lest the material can’t be mixed thoroughly.
    6.    
    7. When agitating, the mixer should move in full direction so that the material can be mixed thoroughly
  6. MIDDLE LAYER COATING
    First, coat middle layer about 2mm thickness, then pour the mixed material onto it. Use teeth-shaped spread knife to spread the material and ensure the uniform thickness. After 24 hours, coat the top layer.
  7. TOP PAINT TREATMENT
    The colorful paste and top paint must be mixed thoroughly then spread it with roller or spray gun.
  8. NON-SLIP TREATMENT
    While working with top painting, adding some non-slip powder and mixing thoroughly before construction.